
Links Way
Find out more
Mayer Construction
Kensington Church Street, London, W8
12 weeks
June 2024
£79k
Bauder
160 m²
The works at Olaf Court involved Bauder waterproofing to roof areas on a residential refurbishment project over a 160 m² area. This included safe2torch bituminous felt and tapered insulation, with warm roof and green roof systems. The scope included installation of the waterproofing system with careful attention to detailing. The completed works deliver a robust roofing solution.
