
Links Way
Find out more
Higgins Partnerships
Ledbury Estate, Ledbury Street, London, SE15
52 weeks
Ongoing
£1m
Bauder
2,500 m²
The works at Ledbury Estate involve Bauder hot melt liquid waterproofing across approximately 2,500 m² of roof area on a large residential scheme. The build-up consists of XPS inverted insulation, PPC flashings, Envirobuild aluminium decking, and green roof finishes. The scope includes installation of the waterproofing system across multiple blocks and roof levels. The works provide long-term protection suitable for a large-scale estate refurbishment.
