
Links Way
Find out more
Higgins Partnerships
Buckland Street, Hackney, London, N1
44 weeks
Ongoing
£974k
Bauder
2,200 m²
The works at Buckland comprise Bauder liquid waterproofing across approximately 2,200 m² of complex roof layouts. The build-up includes felt, aluminium PVC flashing, and both PIR and foam glass tapered insulation. The scope includes installation of the waterproofing system with detailed interfaces to suit varied roof geometries. The works provide effective and lasting roof protection.
