Wood Grange Road
Client
Higgins Partnerships
Location
Woodgrange Road, Forest Gate, London, E7
Duration
54 weeks
Completion Date
June 2024
Contract Value
£748k
Specified System / Manufacturer
Bauder
Roof Area
2,900 m²
Scope of Works & Project Description
The works at Wood Grange Road involved the installation of Bauder total roof systems across approximately 2,900 m² of roof area. The scope included full liquid waterproofing build-ups including bituminous felt and PIR tapered insulation and detailing across multiple residential blocks. The completed installation delivers durable and consistent waterproofing across the development.

“Large development over several roof areas with many private balconies and communal terraces. Before works commenced T&T were actively involved on site with input on detailing and sequencing of works. The project involved several different systems and both PIR and BauderRock insulation. The management by T&T onsite ensured a challenging job was delivered to a high standard.”
Hayden Davies, Regional Manager, Bauder